Cold work tool steel

DIN 1.2436 / AISI D6 Tool Steel

DIN 1.2436 / AISI D6 Tool Steel
DIN 1.2436 / AISI D6 Tool Steel
DIN 1.2436 / AISI D6 Tool Steel

Description

Reviews

DIN 1.2436 / AISI D6 Cold Work Tool Steel

DIN 1.2436 / AISI D6 Cold Work Tool Steel is used for making cutting and drawing tools of high wear resistance, rolls with high dimensional stability, deep drawing tools, tools of wire, bar and tube production, cold shear blades for thin sheets.

Dimensions
Round: dia.10-400 mm
Flat: 6-120 x 40-810 mm
Block: 80-400 x 100-700 mm
Delivery Condition
EAF+(ESR) or EAF+LF+VD+(ESR), Hot rolled or Forged, Annealed, Black surface or Machined surface, UT SEP1921 Class3 D/d
Equivalence
AISI / SAE DIN / W.Nr JIS GB
D6 1.2436 ---- Cr12W
Chemical Composition(%)
Steel Grade C Si Mn P S Cr W
1.2436 2.00-2.30 0.10-0.40 0.30-0.60 ≤ 0.030 ≤ 0.030 11.00-13.00 0.60-0.80
D6 2.00-2.20 0.70-0.90 0.20-0.40 ≤ 0.030 ≤ 0.030 11.50-12.50 0.60-0.90
Cr12W 2.00-2.30 ≤ 0.40 ≤ 0.40 ≤ 0.030 ≤ 0.030 11.50-13.00 0.60-0.80
Characteristics

1. A kind of cold work tool steel with excellent wear resistance and edge holding ability

2. High surface hardness after heat treatment.

3. Medium toughness, but high compressive strength, and good through hardening properties and dimensional stability.

Heat Treatment

Annealing

800 to 850°C

Slow con trolled cooling in furnace at a rate of 10 to 20°C/hr down to approx. 600°C, further cooling in air.

Hardness after annealing: max. 250 HB

 

Stress relieving

650 to 700°C

Slow cooling in furnace; intended to relieve stresses set up by extensive machining, or incomplex shapes.

After through heating, hold in neutral atmosphere for 1 to 2 hours.

 

Hardening

950 to 980°C

Oil, salt bath (220 to 250°C or 500 to 550°C), air plast, still air. Holding time after temperature equalization: 15 to 30 minutes. Obtainable hardness: 64 - 66 HRC.

Special treatment: Hardening 1020°C and tempering at 500°C.

Obtainable hardness approx. 61 HRC (e.g. if followed by nitriding).

 

Tempering

Slow heating to tempering temperature immediately after hardening/time in furnace 1 hour for each 20 mm of workpiece thickness but at least 2 hours/cooling in air. For certain cases we recommend to reduce tempering temperature and increase holding time.

Share your thoughts with us today!   Showing 6 of 0 reviews
Most recent
Top Reviews
Read more
Your rating
Your review *
Name *
Enter your Name
Email *
Enter your Email
Sumbit
Contact Us Now
Enter your inquiry details, We will reply you in 24 hours.
Name can't be empty
E-mail can't be empty
Company can't be empty
Phone can't be empty
Phone
Products can't be empty
Products you want
Message can't be empty
Verification code error
code
Refill
Concact Us Now
Tool Steel Manufacturer, Alloy Steel Manufacturer, Die Steel Manufacturer | Ningshing Special Steel
No. 25, Hongxiang Road, A area Industry Hongtang, Jiangbei, Ningbo,315033, China
You can trust us
We are a professional manufacturer, and we are constantly innovating so that our customers can have better products and services.
© 2018 Ningbo Ningshing Special-Steel Group Co., Ltd. RELATED ARTICLES   SiteMap.html SiteMap.xml
Marketing Support by Globalsir